Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13694023

- Product Categories
- Friendly Links
- home > Supply > Coal bunker liner installation specifications _ Yu-plastic (certified) _ coal bunker liner
Information Name: | Coal bunker liner installation specifications _ Yu-plastic (certified) _ coal bunker liner |
Published: | 2015-04-25 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Coal-pulverizing coal bunker is an important part of the system, in large and medium-sized power plant coal bunker liner unit installation price, the main plant coal bunker most used steel and steel. As the material flow in the warehouse, the warehouse wall friction and steel siding damage easy to make, easy to create a rough steel surface while blocking coal. Substantial loss of condition appears to run, one leading to the loss of the base steel sheet protection and accelerated wear to destroy the other hand, sheet lined bunker debris clogging the discharge port, causing coal supply blocked, this time will have to downtime not only affect the normal production, but also caused huge economic losses. Thus, good design and construction of coal bunker liner, to ensure the safe operation of the unit is of great importance. . Coal bin liners in coal power plants can effectively reduce clogging, for safety equipment play a protective role, so coal bunker liner has now been widely used, widely used in coal mines, docks, power plants and other industries, industrial and agricultural production in the daily, issues include coal, ore powder, granular materials using the vault is very popular, its role can not be underestimated a former coal bunker liner installation, the installation of coal bunker liner should exercise caution, it should be noted: a coal bunker liner first sent surveyors to measure the size of the bunker, the survey overview of the actual pro-coal bunker, and make a reasonable analysis shows that the self-lubricating coal bin liner, ice record transfer program; 2, coal bunker liner and construction program development after dispatch A team staff to problems that may occur awakened thinking, taken after all prospective hundred perfect back well drilling construction completed |
Admin>>>
You are the 28148 visitor
Copyright © GuangDong ICP No. 10089450, Dezhou Yu-Plastic Products Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 28148 visitor
Copyright © GuangDong ICP No. 10089450, Dezhou Yu-Plastic Products Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility